Project |
: |
Workers hospital& integrated health center-Industrial area. |
Client |
: |
Private Engineering Office (PEO)-QATAR. |
Consultant |
: |
Dar AlHandasah. |
Contractor |
: |
VoltasLimitedQatar. |
Code Used |
: |
ASMEB31.1 |
Software |
: |
CAESAR II. |
Project Status |
: |
Completed. |
Scope |
: |
Performed Stress & Structural Analysis for Entire chilled water
Piping Network.
|
Description
- PerformedStressAnalysisforentirechilledwatersupplyandreturnlinesinsidethe Tunnel.
- Preparation of load datasheet for all therigid supports and anchorlocations.
- Support analysis of entire piping network.
You cannot copy content of this page
error: Content is protected !!