Project |
: |
MsheirebDowntown,Doha- Phase-4 |
Client |
: |
Consolidated Contractors Company |
Consultant |
: |
WorleyParsons QATAR |
Code Used |
: |
ASMEB31.1. |
Scope |
: |
Stress &Structural analysis for corridorchilledwater piping.
|
Description
- Stress &Structural analysis for corridor chilled water piping.
- HDPE piping analysis for chilled water services.
- Support analysis for the entire Phase-4 (all services).
- Structural analysis and shop drawing preparation for the chilled water piping network.
You cannot copy content of this page
error: Content is protected !!