| Project | : | MsheirebDowntown,Doha- Phase-4 |
| Client | : | Consolidated Contractors Company |
| Consultant | : | WorleyParsons QATAR |
| Code Used | : | ASMEB31.1. |
| Scope | : | Stress &Structural analysis for corridorchilledwater piping. |

Description
- Stress &Structural analysis for corridor chilled water piping.
- HDPE piping analysis for chilled water services.
- Support analysis for the entire Phase-4 (all services).
- Structural analysis and shop drawing preparation for the chilled water piping network.