Conserve has been appointed by PSH JV for 3D Laser Scanning and preparing the LOD 500 As-built drawings/model for the Green Line Metro package 3 which includes tunnel, cross passage,Evacuation shaft, trough and AlMesila switch box for both MEP and Architecture. Conserve prepared the As-built layouts from the laser scan point cloud files and implemented the Operation and maintainance details by using the COBie.
Project | : | Green Line Metro, Phase 1 |
Client | : | Qatar Railways Company |
Consultant | : | HOARE LEA QATAR LLC |
Contractor | : | PORR - SBG - HBK JOINT VENTURE |
Scope | : | Preparation of LOD 500 As Built models and drawings by using 3D Laser Scan Point Cloud for MEP and Architecture. |
