1/43
1. A project team in a goal-setting meeting is discussing potential sites and integrative synergies. What strategy would earn the project a LEED credit?
Validade Answers
This is the minimum density for LT Credit Surrounding Density and
Diverse Uses Option 1 Surrounding Density.
2. A LEED reviewer has sent a project team technical advice on one of the design credits that was submitted in a split review. What does the project team need to do?
Validade Answers
When a LEED reviewer responds to a credit/prerequisite the review
will contain comments and technical advice. Technical advice includes
things that need to be revised and updated for the credit/prerequisite to
be earned. An example might be 'Revise the building operating plan to
include all design setpoints for all HVAC equipment throughout the
building.' or 'Provide a revised preventive maintenance plan that
includes...'.
3. A 10 acre multi-building development has five buildings. How is the LEED boundary determined if each building will be a separate LEED project?
Validade Answers
The LEED boundary is the portion of the project site submitted for
LEED certification. For single-building developments, this is the entire
project scope and is generally limited to the site boundary. For multiple
building developments, the LEED project boundary may be a portion
of the development as determined by the project team. (-USGBC)
4. A hotel project in a historic district requests that the walkoff mats in the primary direction of travel for the main building's entrance be less than 10 feet (3 meters) long due to the constraints of the historic building porch depths. Who should address this request?
Validade Answers
If a project team needs guidance on an issue before submitting for
certification review, the project CIR process is available to them. The
project CIR will be determined by a GBCI Certification Reviewer
familiar with the project's specific circumstances.
5. Which project would not meet the minimum program requirements for certification?
Validade Answers
Structures must be permanent, so a temporary classroom would not
qualify.
6. Which statement is true about Credit Interpretation Requests (CIRs)?
Validade Answers
CIRs can be submitted for any prerequisite or credit for the project's
rating system.
7. The LEED Pilot Credit for Occupant Engagement is listed only for the O+M rating systems. What is true about a LEED BD+C project's ability to use the credit on the project?
Validade Answers
Occupant Engagement is not part of the BD+C rating systems.
Pilot credits are only available to certain rating systems. If the pilot
credit you're looking at does not have your rating system listed as
applicable, you cannot pursue the pilot credit.
8. A project team member finds an issue not addressed in the LEED reference guide regarding indoor plumbing fixtures and submits a suggested approach to the credit during the standard LEED review process. What is true about this approach?
Validade Answers
When dealing with an issue not addressed in available LEED guidance
material, project teams have the option of submitting a suggested
approach during the standard LEED certification process. They will
receive a determination in the review comments at the discretion of the
reviewer assigned to the project.
9. The owner of a space has had a lot of turnover in the project team, resulting in delays in LEED documentation. How long can the project team wait to submit the construction phase review?
Validade Answers
Deadline for submitting for review
For LEED BD+C and LEED ID+C rating systems, you will need to
submit for your construction phase review (preliminary standard
review or preliminary construction review) no later than two years after
your project is substantially completed (the date on which your
building receives a certificate of occupancy or similar official
indication that it is fit and ready for use).
10. Which project strategy would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies?
Validade Answers
SS Credit Rainwater Management has exemplary performance for
managing 100% of the rainwater that falls within the project boundary.
11. Which elements are not covered under the LEED BD+C: Core and Shell rating system?(choose 2)
Validade Answers
Tenant fit-outs are part of the LEED ID+C.
FF&E are part of the LEED ID+C rating systems. Furniture is also addressed in LEED BD+C.
Core and shell covers the following base building elements:
Structure
Envelope
HVAC System
12. If a project boundary is not obvious because of ownership by multiple entities, which action should the project team take?
Validade Answers
This is the first place to look for suggestions.
13. Which action is an example of an overlapping benefit that a project team might find during ongoing discovery while iteratively testing alternatives and refining an analysis?
Validade Answers
This is an example of looking for new opportunities in the design that support the project goals.
14. A team in a goal setting-workshop has selected to pursue LEED Gold, identified credits to pursue and assigned responsible parties to each credit and prerequisite. After evaluating possible energy strategies what does the team need to document for IP Credit Integrative Process?
Validade Answers
The credit documentation requires describing how the analysis informed the design decisions in the project's OPR and BOD.
15. The LEED project boundary may not include land that is owned by a party other than that which owns the LEED project unless:
Validade Answers
See Reasonable Site Boundary in the reference.
The only exception to the LEED project boundary of land not owned
by the project owner is land that is associated with and supports normal
building operations for the LEED project building.
16. Which part of the LEED development cycle is used for streamlining the approach to particular needs, constraints, and opportunities of different project types?
Validade Answers
The process of making adaptations to existing ratings systems and their credits provides an efficient and streamlined approach for responding to the particular needs, constraints, and opportunities of different project types.
17. Which project strategy would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies?
Validade Answers
EQ Credit Low Emitting Materials can earn exemplary performance under both options. 100% of products must meet the requirements.
18. The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum?
Validade Answers
The team can accept the preliminary review results as final if they are
satisfied, submit new or revised documentation, or attempt additional
credits before submitting the project for a final review.
19. A project has achieved one pilot credit, has earned exemplary performance in three credits, and has used a strategy for innovation. How many points would this project earn?
Validade Answers
Innovation earns up to 4 points. The example earned 1.
Pilot credits earn up to 4 points. The example earned 1.
Exemplary performance earns up to 2 points. The example achieved 3 credits, but 2 points is
the maximum number that can be earned.
The maximum for the Innovation credit is 5 points.
One additional point can be earned for LEED AP.
20. How is the LEED boundary defined for a single building development?(choose 2)
Validade Answers
The LEED boundary is the portion of the project site submitted for
LEED certification. For single-building developments, this is the entire
project scope and is generally limited to the site boundary. For multiple
building developments, the LEED project boundary may be a portion
of the development as determined by the project team. (-USGBC)
The LEED boundary is the portion of the project site submitted for
LEED certification. For single-building developments, this is the entire
project scope and is generally limited to the site boundary
21. Which project strategy would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies?
Validade Answers
LT Credit Access to Quality Transit can earn exemplary performance
for doubling the highest transit service point threshold.
22. A 100,000 SF (9,290 m2) new office building will have mixed-mode ventilation and steam boilers. The building owner wants to hire a consulting firm owned by a relative for the Cx process. What is true about this decision?
Validade Answers
For fundamental commissioning the CxA must have experience
working on at least two other projects with similar scopes of work. The
owner gets to determine if the experience is similar or not for those two
other projects when comparing them to the new project.
23. A project team wishes to get a Credit Interpretation Request on a credit and prerequisite that are unrelated. Which action will assist with this process?
Validade Answers
Inquiries must request guidance on just one credit or prerequisite
(unless there is technical justification to do otherwise) and generally
contain one concise question or a set of related questions.
Projects spend money on CIRs for prerequisites for the same reason as
for credits - to find out if a particular solution qualifies the project for
meeting the requirements. The project may meet the requirements of
the prerequisite but sometimes submitting a CIR is the only way to find
out.
24. A LEED AP in a goal setting workshop is working on their first LEED BD+C: Schools project. What prerequisites would be applicable to the project and need to be assigned to team members?
Validade Answers
The following credits / prerequisites are specific to Healthcare only. It
is important to know which credits/prerequisites are specific to the
different rating systems
Healthcare:
IP Prerequisite Integrative Project Planning and Design
SS Credit Places of Respite
SS Credit Direct Exterior Access
MR Prerequisite PBT Source Reduction - Mercury
MR Credit PBT Source Reduction - Mercury
MR Credit PBT Source Reduction - Lead, Cadmium, and Copper
MR Credit Furniture and Medical Furnishings
MR Credit Design for Flexibility
Schools:
SS Prerequisite Environmental Site Assessment
SS Credit Site Master Plan
SS Credit Joint Use of Facilities
EQ Prerequisite Minimum Acoustic Performance
25. A project team for a LEED BD+C Healthcare is in a goal setting workshop. What credits would be applicable to the project and need to be assigned to team members?
Validade Answers
The following credits / prerequisites are specific to Healthcare only. It
is important to know which credits/prerequisites are specific to the
different rating systems
Healthcare:
IP Prerequisite Integrative Project Planning and Design
SS Credit Places of Respite
SS Credit Direct Exterior Access
MR Prerequisite PBT Source Reduction - Mercury
MR Credit PBT Source Reduction - Mercury
MR Credit PBT Source Reduction - Lead, Cadmium, and Copper
MR Credit Furniture and Medical Furnishings
MR Credit Design for Flexibility
Schools:
SS Prerequisite Environmental site assessment
SS Credit Site Master Plan
SS Credit Joint Use of Facilities
EQ Prerequisite Minimum acoustic performance
26. A 2-story mixed use project will have retail space on the first floor and hospitality space on the second floor. Since there more than two rating systems that might be applicable to a project, how should the project team decide which rating system to use?
Validade Answers
LEED has a 40/60 rule to help project teams decide on a rating system:
If a particular rating system is appropriate for 40% or less of a
LEED project building or space, then that rating system should
not be used.
If a particular rating system is appropriate for 60% or more of a
LEED project building or space, then that rating system should
be used.
Project teams with buildings and spaces that do not fall into the
scenarios described in a) and b) must independently assess their
situation and decide which rating system is most applicable.
27. Which project strategy would earn an exemplary performance point under IN Credit Innovation Option 3 Additional Strategies?
Validade Answers
EQ Credit Quality Views can earn exemplary performance by
providing views for 90% of all regularly occupied areas.
28. Which special considerations would be part of the LEED project scope?(Choose 2)
Validade Answers
Off-site amenities or shared facilities off site are special considerations, since they fall
outside of the LEED project boundary.
29. A project was registered in January of 2013. In April 2013 USGBC published Addenda for a credit the project team is pursuing. What statements are true regarding this project?(Choose 2)
Validade Answers
Project teams must follow Addenda published prior to their project's registration date. It's
strongly recommended that project teams also follow Addenda published after their
registration date.
In this scenario the project must follow addenda prior to January 2013 and can choose to
follow any addenda released after the project is registered.
30. Which design decisions can earn a project IN Credit Option 1 Innovation in a new construction project?
Validade Answers
Green housekeeping is considered innovation for BD+C projects.
Note the difference in the Innovation credit for 'exemplary' performance, and those for
'innovative' performance.
31. Which design decisions can earn a project IN Credit for exemplary performance?(Choose 2)
Validade Answers
This earns exemplary performance for Option 1 transparency.
32. During an early design review, a project team has decided to consolidate the building footprint and add underground parking. These changes can contribute to earning which credits?(Choose 2)
Validade Answers
Runoff volumes can be reduced by consolidating the building footprint and designing the
building with underground parking. This strategy also reduces heat island effects.
Changing the building footprint and where parking is located does not necessarily mean that
total parking capacity will change.
33. Which of the following may earn a project IN Credit Innovation for Innovation?
Validade Answers
A green education program is one of the more common innovation
strategies.
34. A team member is reviewing the LCA narrative for MR Credit Building Life-Cycle Impact Reduction Option 4 Whole-Building Life Cycle Assessment. What table is going to be included in the narrative?
Validade Answers
The requirements are to reduce at least 3 impact categories by 10% and
not increase any category by 5%. The LCA narrative will include a
table listing each impact category and the values from the LCA.
35. An office complex near a lake is being designed. The project will be built on a prime tract of undeveloped real-estate 40 ft. (12 meters) from the lake. The project will be located 1/8 mile (200 meters) from 3 public bus lines. Which credit would NOT be achievable for the project?
Validade Answers
Sensitive Land Protection is not possible because the site is located 40 ft. (12 meters) from
the lake. The credit states that you cannot build on undeveloped land within 100 ft. (30
meters) from a water body.
The site is a greenfield but the project team can still limit site disturbance to earn SS Credit
Site Development-Protect or Restore Habitat.
36. A project building that originally registered as one building has undergone a design change and now has two different structures. Which action should be taken to determine if the building can remain a single project?
Validade Answers
This path is meant to provide assistance with existing LEED guidance
or processes.
37. A LEED BD+C project will be constructed and operated on a permanent location on existing land, and will be a minimum of 1,000 SF (93 m2). What else must the project do to meet the minimum program requirements?
Validade Answers
This is the 3rd MPR the project would need to meet.
38. The project team for an office building is considering a composting program. Which statement is true regarding the IN Credit Innovation for a composting program?
Validade Answers
The three basic criteria for achieving an IN credit for a category not
found in the LEED rating system are as folows:
Quantitative. This means the concept must have
measurable/quantifiable environmental benefits. Establish a baseline
and compare it with the final outcome to determine the improvement.
How much environmental benefit did the strategy achieve?
Comprehensive. The process or specification must be comprehensive.
For example, if a new material could be used in every floor of a
building, the project team can't use it in just one floor. A process that
only addresses a part of the project isn't considered comprehensive and
does not meet the credit requirements.
Transferrable. The concept must be able to be used on other projects by
other project teams. It can't be a concept that only applies to a unique
aspect of one project.
The IN point for a composting program would only be allowed if all
building occupants would have access to the program. For example, a
project team can't say that they are limiting a program to the occupants
on floors 1-5 and that occupants on floors 6-10 can't participate
because there isn't enough space for all the compost.
39. How can a project team avoid errors and expenses in LEED documentation prior to submitting the project for review?(Choose 3)
Validade Answers
Proofreading, checking numerical values for consistency across credits, and checking the
application for completeness all cuts down on errors and additional expenses.
40. A national park located in MLO lighting zone 2 has walking paths around a lake, a 150-car parking lot, a national flag in front of the visitors center, and a small amphitheater for giving presentations. The road leading to the park has government mandated lighting. What exterior lighting would be exempt from SS Credit Light Pollution Reduction?
Validade Answers
There are exemptions from uplight and light trespass requirements.
Check the rating system requirements for the complete list of exempt
lighting.
41. A project team member has excluded a section of land in order to meet the requirements of one of the LEED credits. Which statement is true about this action?
Validade Answers
Land cannot be excluded for the purposes of complying with a
credit/prerequisite. This is known as gerrymandering.
42. Which action would earn a project an IN Credit?
Validade Answers
For exceptional performance, doubling the requirements or meeting the
next incremental percentage threshold can earn an IN credit.
43. What best defines the project boundary?
Validade Answers
The project boundary is the platted property line of the project defining
land and water within it. (-USGBC)
While you may have a different definition of some terms the LEED exams test on the USGBC
definitions, not on personal experience or beliefs. Therefore the practice tests include the
definitions from USGBC.
Check Answers
Your Result:
Review Answers
Sorry, no results found.
Please repeat the quiz and try different answer combinations.