1/57
1. The project civil engineer, landscape architect, and hydrologist are meeting to confirm that the green infrastructure and low-impact development measures selected for the site are sufficient to manage the required volume of runoff for the 95th percentile of rain events. If they find the design cannot manage the required volume of runoff, which action should be taken next? 4
Validade Answers
You cannot copy content of this page
error: Content is protected !!